{"id":4295,"date":"2026-10-14T11:13:41","date_gmt":"2026-10-14T09:13:41","guid":{"rendered":"https:\/\/euro-techniek.nl\/?p=4295"},"modified":"2026-10-07T11:17:19","modified_gmt":"2026-10-07T09:17:19","slug":"injection-molding-and-assembly-without-intermediate-storage","status":"publish","type":"post","link":"https:\/\/euro-techniek.nl\/en\/spuitgieten-en-assembleren-zonder-tussenopslag\/","title":{"rendered":"Injection molding and assembly without intermediate storage"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A part that goes into a bin after being thrown in, then into a box, then onto a pallet and then to a second company is not the same part at the end of that journey. It is older, it has seen dust and it has endured vibrations. In plastic assembly at the same location as where it is sprayed, that entire journey disappears from the process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In calculations, that trip rarely comes back. Clients calculate with a unit price for the component and a rate for assembly. The items in between remain invisible. Inter-warehouse storage requires floor space, packaging materials, forklift movements, inventory management, and people who move boxes. None of these items make the final product better, and each item carries its own risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What a short line yields is, besides speed, primarily an overview of the process. If a component arrives within a few hours after the order has been placed, the customer can see the progress of the order. <a href=\"https:\/\/euro-techniek.nl\/en\/expertise\/injection-molding\/\">injection moulding<\/a> If the composition is correct, you will notice a deviation while the mold is still in the machine. If there is weeks worth of stock left, you will only notice the deviation when everything has already been made.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What buffer storage costs in terms of time, space and risk<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Space is the most visible cost. Each pallet of semi-finished product takes up square meters that are not used for production. In a facility with approximately 9,950 square meters of production space, like ours in Veldhoven, that is a choice that you make consciously rather than being given.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Time is the second post. A component that waits does not earn anything back. The money in that inventory remains idle until it is incorporated into an end product. With high-volume plastic injection molding products, this quickly runs out because the quantities are large and the assembly process often takes less time than the time it takes for the material to be stored.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Risk is the third and usually the most expensive post. Damage occurs during handling and not during production itself. Scratches on visible surfaces, bent snap-fit parts, broken ribs and dented packaging almost all result from picking up, stacking or driving the product extra times. Contamination works the same way. Every transshipment brings dust, fibers or grease into the vicinity of a surface that must later be glued or welded. For medical and high-tech applications, this is a real problem, because an invisible film layer disrupts bonding.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>From the mold to the assembled product all under one roof<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The chain starts with engineering, where product design is made feasible and the assembly sequence is already taken into account. Then our own design and manufacturing team designs and builds the product. <a href=\"https:\/\/euro-techniek.nl\/en\/expertise\/tool-shop\/\">Tool shop<\/a> The mold is tested, modified where necessary, and the tool is maintained throughout the project. Then injection molding is performed. Wherever a composition contains metal parts, they come from the stamping process at the same location.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Then follows the <a href=\"https:\/\/euro-techniek.nl\/en\/expertise\/assemble\/\">assemble<\/a>, Here, the individual parts are brought together and controlled to form a working whole. Finally, the supply chain manages the inventory arrangements and the delivery to your line. Six expertises that follow one another in the same building, without requiring a truck or an external inventory location between two steps.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Plastic assembly makes quality problems more visible<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A mechanic who gets one part to fit smoothly into another is the fastest quality measurement there is. If that mechanic is a hundred meters from the injection molding machine, a process parameter can be adjusted the same day. If he works for another company in another province, a process begins of photos, measurement reports and phone calls in which no one knows exactly which batch comes from where anymore.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The feedback also works in the other direction. During assembly, we see which deviations really hinder production and which seem strict on paper but in practice play no role. This knowledge goes directly back to the mold. That is exactly the reason why <a href=\"https:\/\/euro-techniek.nl\/en\/quality-and-repeatability-in-injection-moulding-of-products\/\">Quality and repeatability in injection molding<\/a> They are more manageable when the follow-up step takes place in the home environment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Less packaging and a shorter lead time<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Packaging for transport between companies is packaging that is discarded twice. Blisters, spacers, foil and boxes are purchased, filled, transported, emptied and disposed of, while they do not add anything to the product. If the component remains on site, reusable containers between two departments suffice. This saves on purchasing and reduces waste, which aligns with our approach to sustainable production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The lead time is getting shorter for a simple reason. The waiting time between companies consists of transport days, receipt verification, booking, and scheduling with the next party. Those steps are eliminated. In the case of a rush series or an engineering change halfway through a project, that difference is between days and weeks.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>One point of contact instead of divided responsibility<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Once two parties are working on a single product, a boundary arises over which discussion is possible. Was it due to the sizing of the component or to the assembly method? That question takes time and rarely yields an answer that satisfies both parties. With <a href=\"https:\/\/euro-techniek.nl\/en\/to-have-a-plastic-product-manufactured-with-assembly-under-one-roof\/\">assembly under one roof<\/a> Is there one party that is responsible for the final product and one contact person who oversees the entire chain?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For products with higher cleanliness requirements, the final step in the cleanroom process takes place in the ISO 7 and ISO 8 classes, where inspection, dimensional control, functional testing, vacuum leak testing and controlled packaging take place. The product will only leave the premises after it has been fully tested.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you are considering a composition that is currently being made by two or three parties, it is worth taking a look at the intermediate steps on paper. We would be happy to work with you to see what is lost in the chain when injection molding and plastic assembly take place on the same floor. Feel free to contact us. <a href=\"https:\/\/euro-techniek.nl\/en\/contact\/\">Contact<\/a> on with a drawing or a product description.<\/p>","protected":false},"excerpt":{"rendered":"<p>Een onderdeel dat na het uitwerpen in een bak gaat, daarna in een doos, dan op een pallet en vervolgens naar een tweede bedrijf rijdt, is aan het einde van die reis niet meer hetzelfde onderdeel. Het is ouder, het heeft stof gezien en het heeft trillingen doorstaan. Bij kunststof assemblage op dezelfde locatie als&#8230;<\/p>","protected":false},"author":13,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_yoast_wpseo_title":"","_yoast_wpseo_metadesc":"","_yoast_wpseo_focuskw":"","_yoast_wpseo_canonical":"","rank_math_title":"","rank_math_description":"","rank_math_focus_keyword":"","rank_math_canonical_url":"","_aioseo_title":"","_aioseo_description":"","_aioseo_keywords":"","_aioseo_canonical_url":"","footnotes":""},"categories":[1],"tags":[],"post_folder":[],"class_list":["post-4295","post","type-post","status-publish","format-standard","category-nieuws"],"acf":[],"_links":{"self":[{"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/posts\/4295","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/comments?post=4295"}],"version-history":[{"count":0,"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/posts\/4295\/revisions"}],"wp:attachment":[{"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/media?parent=4295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/categories?post=4295"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/tags?post=4295"},{"taxonomy":"post_folder","embeddable":true,"href":"https:\/\/euro-techniek.nl\/en\/wp-json\/wp\/v2\/post_folder?post=4295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}